home > sell > Design and build a daily 2-ton glass electric melting furnace
Design and build a daily 2-ton glass electric melting furnace
products: Views:5Design and build a daily 2-ton glass electric melting furnace 
brand: 承德新羲
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-10-21 15:02
 
Details

cbrr=> r)r) )rb:) r) : . )

r)r) )rb:) r) : . <: .> brr ) r . )

brr )rr) . ) >) >
) >ton continuous

brr )rr) . ) >) >
) >Ton continuous type

r)r )r . ) >) >
) >Hour amount of material

r)r )rr ) . ) >) >
) >t

r)r )rr) . ) >) >
) >t

r)r )r . ) >) >Power consumption per kilogram of molten glass

r)r )rr) . ) >) >.
) >degree/kg

r)r )rr) . ) >) >
) >degree/kg

r)r )r . ) >) >Installed capacity
/>
r)r )rr) . ) >) >
) >KW

r)r )rr) . ) >) >
) >KW

r)r )r . ) >) >Overhaul cycle

r)r )rr) . ) >) >
) >year About

r)r )rr) . ) >) >
) >years



) > ) >一
) >Working method:
) >) >
) >Continuous&& produces non-stop like a large electric furnace.
) >) >
) >Continuous && hourly chemical processing, production during the day.
) >) >2
) >Discharging method: manual picking and dripping. Designed according to user requirements.
) >) >Three
) >Can melt materials of various colors.
) >) >Four
) >Can melt various materials:
c)> )>Soda-lime glass frit, Ruhuo material, barium-potassium material, high borosilicate, lead material , crystallized glass, etc.
) >) >Five
) >The structure is the same as that of a large electric furnace.
) >
) >) >Five
) >On-site manufacturing&
) > Building an electric stove is like building a house. It must be ensured that there are basically no brick joints, and it is not suitable to be transported by car. It is best to construct it on site.
) >) >Seven
) >Heating method&& Heating with molybdenum electrode or tin oxide electrode. Each electrode requires cooling, and water cooling is better than air cooling.
) >) >8
) >The material utilization rate can almost reach %. Utilizing the principle of the conductivity of the glass liquid itself,
)>The molybdenum electrode is heated from the inside out, which can ensure uniform and stable material quality. Like the large electric furnace, the material liquid utilization rate of the small electric furnace can reach almost %.
) >) >Nine
) >Small electric furnaces are simple to operate, easy to control, low in labor and low in maintenance costs.
) >) >Ten
) >Overhaul costs
) >) >
) >Overhaul after one cycle of use. Steel frame, cooling water does not need to be moved. Wearing parts of electrical appliances must be replaced. Bricks of various types cannot be reused and must be purchased again. But the remaining zirconium corundum bricks can be sold to brick factories. Molybdenum electrodes may be added depending on the loss. The water jacket cooling the molybdenum electrode must be replaced.


Request for quotation