Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Chengde Xinxi Glass Technology Co., Ltd.

Design and construction of glass electric furnace, glass electric furnace and...

sell
  • There is no classification
contact
  • Contact:陈金艳
  • Phone:86-0314-2065238
  • Email:cdxinxi@126.com
  • fax:0314-2065238
search
 
link
  • There is no link yet
home > sell > Design and build a glass sun pool kiln with a daily output of 100 kilograms
Design and build a glass sun pool kiln with a daily output of 100 kilograms
products: Views:5Design and build a glass sun pool kiln with a daily output of 100 kilograms 
brand: 承德新羲
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-10-21 15:02
 
Details

b> >Produces kilograms of molten glass per hour.
b> >Two
>Each kilogram of molten glass consumes about 0.000 kWh&& except for special materials.
b> >Three installed capacity:
b> >Four major maintenance cycles:
>
>year, year
b> >Five working mode: intermittent && black Natural materials, produced during the day. It can produce materials in hours and produce in hours. It can also produce materials in hours and produce in hours. It depends on how easy the material is to melt.
b> >Six discharging methods: manual picking and dropping. Designed according to user requirements.
b>Seven can melt materials of various colors, such as amber, copper green, cobalt blue, sky blue, grass green, yellow green, black, purple, red, etc. Can be replaced with different colors of the same tone. Especially the molten red material not only has a correct color, but also has a stable color. b>Eight can melt various materials>: soda-lime glass, Ruhuo, barium-potassium, high borosilicate, lead, glass-ceramics, etc.
b> >Nine
>
>The structure is the same as that of the large electric furnace.
>
>The innermost layer of the small electric furnace is zirconium corundum bricks, followed by clay bricks and insulation bricks. , insulation cotton, the outermost layer is supported by a steel frame.
b> >10 On-site fabrication&& Building an electric furnace is like building a house. It must be ensured that there are basically no brick joints. It is not suitable to be transported by car. It is best to construct it on site.
b> >Eleven
>
>Heating&&heat with molybdenum electrode or tin oxide electrode. Each electrode requires cooling, and water cooling is better than air cooling.
b> >The utilization rate of the twelve-material liquid can reach almost %. Utilizing the principle of the conductivity of glass liquid itself,
>
>The molybdenum electrode is heated from the inside out, which can ensure uniform and stable material quality. Like the large electric furnace, the material liquid utilization rate of the small electric furnace can reach almost %.
b> >Thirteen
>
>Small electric furnaces are simple to operate, easy to control, have low labor workload and low maintenance costs.
b> >Fourteen is flexible to use. According to the order situation, the furnace can be shut down and put aside when not in use, and re-ignited when in use.
b> >Fifteen overhaul costs
> >Overhaul after one cycle of use. Steel frame, cooling water does not need to be moved. Wearing parts of electrical appliances must be replaced. Bricks of various types cannot be reused and must be purchased again. But the remaining zirconium corundum bricks can be sold to brick factories. Whether to add molybdenum electrode depends on the loss. The water jacket cooling the molybdenum electrode must be replaced.
Request for quotation
A total of0articles  Related Comments: